Earlier this month we were hosted by Lavender and Lovage while building their Shepherd's Hut: Bluebell in their garden.
What follows is mostly photos of the various stages of the build.
Day zero:
Day one on site:
In the background you can see the low carport which is the main reason that this Shepherd's hut needed to be constructed on site.
The windows are in at this point, door frame is ready and the stable door was then fitted before the end of day 1. The idea is to get the Shepherd's hut watertight as soon as possible.
The second layer of boards went up during our second day on site. The window trims, and other details are also being fitted. As you can see the last of the pre painted boards ran out, and we were dodging the wet and windy weather so painting had to be halted.
Inside was mostly clad by the end of play on day 2. The engineered wood floor is almost finished. First fix wiring was also in.
Looking like a Shepherd's hut now. Still some trim and lots of finishing off inside to do.
Day Three:
Day Four on site:
a couple of days later we returned to finish off.
a couple of days later we returned to finish off.
Shutters were added.
The kitchenette was put in.
it has a small on demand water heater, and is fed from the mains water outside.
A small drawer for utensils, and an oak draining board /flip/ chopping board
The bed is in a small alcove and is hinged so that access underneath is easy if required. It can also be lifted up at the back to use as a sofa once the mattresses are in.
Closed shutters ready for another storm.
A small alcove around the bed area, shelves, decorative hearts and all of the electrics are done.
It is now up to Lavender and Lovage to paint the inside of Bluebell exactly how they want and add their own finishing touches.