This is how we left the outside on the first day. The hut was watertight, first layer of cedar on.
Doors and windows fitted.
This is mostly how the inside was left after the first day. The first fix of the wiring was done on the second day.
The end window and second layer of the cedar now fitted. The hut is coming together now.
There would be more done if we were staying in the area, however we cannot at this time.
The two smaller side windows and the finished wall
The closeness to the hedge on site didn't help the build.
The end blank end of this shepherd's hut.
The customer will be fitting their own dresser on this end wall.