We've also put in most of the light fittings and switches. There are still wall lights to fit.
We are playing with the idea to put a sliding door on the partition wall as this should suit the space and the theme better.
The upper parts of the walls and ceiling, all of the Tongue and Grooving, has been painted in Cream, the lower sections of the walls have been scumbled.
The white space is approximately where a multi-fuel stove will be going.
Window in the cupboard area, still to be framed out.
The space in the corner will be fitted out with a kitchenette and then a bench-bed (couchette) will be under the nearest window on the left.
View from the cupboard door.
Getting close to the flooring stage, we try to avoid this while still painting as the floor comes pre-lacquered and thus pretty much ready to go.
No comments:
Post a Comment